REMEDIAL REPAIR – WHP

Location
Maari Field, New Zealand
Principal
MODEC/OMV
Period
June 2018 - August 2018

Air Diving and NDT Services; Remedial repair inclusive of cutting subsea horizontal member. Removal of anodes struts and doubler plate to fit engineered clamps. Gather metrology data for permanent clamp design of target locations. Installation of three temporary clamps and rigging to support member.

No LTI’s, 4,217 minutes of BT, 9 personnel